DANY, DIAN WIDIATMOKO (2025) ANALISIS FAKTOR FAKTOR YANG MEMPENGARUHI CYCLE TIME PADA PT. CAKRAWALA NUSA BAHARI. SKRIPSI.
![]() |
Text
SKRIPSI DANY DIAN W.pdf Restricted to Repository staff only Download (2MB) |
Abstract
Kalimantan is the center of Indonesian coal production, which produces more than 90% of coal production in the country. Kalimantan's coal reserves are actually only about 51% of coal reserves (resources) in the country, while other regions, especially Sumatra, also have large amounts of coal reserves. Various mineral deposits such as petroleum and coal are stored in large quantities buried in the bowels of the earth. This research is expected to be able to see and learn about several variables of Waiting Time, Loading and Unloading Productivity and Ship Scheduling whether they affect Cycle time at PT. Nusa Tenggara Horizon. The results showed that there was a positive and significant effect between Waiting Time and Cycle time (t count value of 3.726 > t table value of 1.98472). The results of the multiple linear regression equation showed that there was a positive and significant effect between Unloading and Loading Cycle time (t count value of 2.777 > t table value of 1.98472), the results of the multiple linear regression equation show that there is a positive and significant effect between Ship Scheduling on Cycle time (t count value of 2.641 > t table value of 1.98472 ) Keywords: Waiting Time, Loading and Unloading, Ship Scheduling and Cycle time
Item Type: | Article |
---|---|
Additional Information: | 200.10.5064 |
Subjects: | Teknik Transportasi Laut |
Divisions: | Program Studi > S1-Teknik Transportasi Laut |
Depositing User: | AMNI Perpustakaan Semarang |
Date Deposited: | 03 Jun 2025 03:55 |
Last Modified: | 03 Jun 2025 03:55 |
URI: | http://repository.unimar-amni.ac.id/id/eprint/6550 |
Actions (login required)
![]() |
View Item |