ANALISIS PENGARUH KINERJA OPERATOR BONGKAR MUAT, PERALATAN BONGKAR MUAT DAN WAKTU TUNGGU TRUK TERHADAP PRODUKTIVITAS BONGKAR MUAT DI PELABUHAN KRAKATAU BANDAR SAMUDERA CIGADING BANTEN (Studi Kasus Di PT. Tarub Buana Stevedores)

M MIRZA, RAHMAN MAHENDRA (2023) ANALISIS PENGARUH KINERJA OPERATOR BONGKAR MUAT, PERALATAN BONGKAR MUAT DAN WAKTU TUNGGU TRUK TERHADAP PRODUKTIVITAS BONGKAR MUAT DI PELABUHAN KRAKATAU BANDAR SAMUDERA CIGADING BANTEN (Studi Kasus Di PT. Tarub Buana Stevedores). SKRIPSI.

[img] Text
NAMA.M MIRZA RAHMAN MAHENDRA. NIM.192004127.pdf
Restricted to Repository staff only

Download (5MB)

Abstract

ABSTRACT This research was conducted to determine the performance analysis of loading and unloading operators, loading and unloading equipment and truck waiting time on loading and unloading productivity. Item collection was carried out using 60 respondents. Through the method of observation, literature study and questionnaires. The analysis technique used is multiple linear regression with the help of the SPSS V.26 program. based on the results of research and multiple linear regression analysis the resulting equation is: Y= - 0.263 + 0.368.X1 + 0.414.X2 + 0.220.X3 + µ Where the results of the regression analysis and t test show that the loading and unloading operator performance variable (X1) has a positive and significant effect on the loading and unloading productivity (Y), the loading and unloading equipment variable (X2) has a positive and significant effect on the loading and unloading productivity (Y), the waiting time variable trucks (X3) and has a positive and significant effect on loading and unloading productivity (Y). The results of the coefficient of determination (R2 = 0.462) which means 46.2%, the performance coefficient of loading and unloading equipment operators, loading and unloading and truck waiting time on loading and unloading productivity is 46.2%, while the rest (100% -46.2% = 53 .8% is influenced by other variables outside the research. Keywords: Performance of Loading and Unloading Operators, Loading and Unloading Equipment, Truck Waiting Time and Loading and Unloading Productivity.

Item Type: Article
Additional Information: 192004127
Subjects: Transportasi
Divisions: Program Studi > S1-Transportasi
Depositing User: AMNI Perpustakaan Semarang
Date Deposited: 14 Sep 2023 06:46
Last Modified: 14 Sep 2023 06:46
URI: http://repository.unimar-amni.ac.id/id/eprint/5618

Actions (login required)

View Item View Item