PROSEDUR DAN PROSES PEMBONGKARAN MUATAN PADA MV. SPRING SHINE DI PELABUHAN TANJUNG EMAS SEMARANG OLEH PT. RIMO TRANSPORT EXPRESSINDO

DWI, PRASETIO (2022) PROSEDUR DAN PROSES PEMBONGKARAN MUATAN PADA MV. SPRING SHINE DI PELABUHAN TANJUNG EMAS SEMARANG OLEH PT. RIMO TRANSPORT EXPRESSINDO. KARYA TULIS.

[img] Text
7. BAB 1.pdf
Restricted to Repository staff only

Download (92kB)
[img] Text
8. BAB 2.pdf
Restricted to Repository staff only

Download (290kB)
[img] Text
9. BAB 3.pdf
Restricted to Repository staff only

Download (163kB)
[img] Text
10. BAB 4.pdf
Restricted to Repository staff only

Download (352kB)
[img] Text
11. BAB 5.pdf
Restricted to Repository staff only

Download (147kB)

Abstract

MV. Spring Shine which is a cargo ship that contains goods in packaging. This ship berthing at the port of Tanjung Emas Semarang and appointed PT. Rimo Transport Expressindoas the loading and unloading agent. The purpose of loading and unloading activities is very important, namely to encourage the achievement of national logistics integration evenly in both urban and rural areas. The implementation of this observation uses descriptive qualitative research, namely by describing the implementation of loading and unloading procedures and processes from the ship to the hauling process out of the dock. Sources of data obtained are based on sources, activities and documents. Data collection techniques used were observation, interviews and document study so that it can be analyzed and conclusions drawn. The results of observations made at the Port of Tanjung Emas in Semarang, the authors concluded that the loading and unloading procedures and processes by PT. Rimo Transport Expressindohas complied with the applicable regulations. However, in observation, the authors found several factors that interfere with loading and unloading performance, such as: labor problems, lack of security, corruption, and lack of port facilities. And there are also obstacles that are related to technicalities in the field, such as the ineffective docking of the ship, lack of coordination, damage to equipment, and ineffective means of transport. The solutions to overcome these problems include: improving employee work shifts, improving coordination between all parties involved in the loading and unloading process and making more thorough preparations. Keywords :Procedure, Process, Loading and Discharge, Solution

Item Type: Article
Additional Information: 195730051
Subjects: Nautika
Divisions: Program Studi > D3-Nautika
Depositing User: AMNI Perpustakaan Semarang
Date Deposited: 31 Jan 2023 02:56
Last Modified: 31 Jan 2023 02:56
URI: http://repository.unimar-amni.ac.id/id/eprint/5066

Actions (login required)

View Item View Item