BONGKARAN MUATAN CURAH BATU BARA OLEH PERUSAHAAN BONGKAR MUAT PT. BIRA BUMI PERSADA DI PELABUHAN CIREBON

HANIF, FAIZAL (2022) BONGKARAN MUATAN CURAH BATU BARA OLEH PERUSAHAAN BONGKAR MUAT PT. BIRA BUMI PERSADA DI PELABUHAN CIREBON. KARYA TULIS.

[img] Text
3. BAB 1_kti _Hanif_Faizal.docx
Restricted to Repository staff only

Download (40kB)
[img] Text
5. BAB 3_kti_Hanif+Faizal.docx
Restricted to Repository staff only

Download (36kB)
[img] Text
4. BAB 2_kti_Hanif_Faizal.docx
Restricted to Repository staff only

Download (36kB)
[img] Text
7. BAB 5_kti_Hanif Faizal.docx
Restricted to Repository staff only

Download (28kB)
[img] Text
6. BAB 4_kti_HanifFaizal.docx
Restricted to Repository staff only

Download (3MB)

Abstract

Bearing in mind that the Unloading and Loading Implementation (PBM) business activities include the activities of unloading and loading ship goods at the port. The loading and unloading activities carried out by the loading and unloading company are service activities engaged in loading and unloading of ship goods at the port which includes stevedoring, cargodoring, and receiving/delivery activities as stated in Law No. PM. 60 of 2014 Article 2 Chapter II. The purpose of this paper is to find out what tools, documents, and obstacles are in the process of loading and unloading of bulk coal by PT. Bira Bumi Persada at Cirebon Harbor. Here the author uses the method of data collection by direct observation and interviews in land practice. The results of observations made at PT. Bira Bumi Persada in this writing is to find out the tools used during loading and unloading activities, the required documents, as well as the obstacles that arise from the implementation of coal bulk loading and unloading activities such as lack of skills (TKBM), damage to loading and unloading equipment. loading, as well as obstacles due to bad weather. In the research that has been carried out the author draws the conclusion that PT. Bira Bumi Persada has carried out coal bulk loading and unloading activities optimally, although there are obstacles/obstacles that occur, they will be minimized as small as possible, in order to create fast and optimal coal bulk activities at the Port of Cirebon. Keywords: loading and unloading, tools, documents, obstacles.

Item Type: Article
Additional Information: 195710071
Subjects: Ketatalaksanaan Pelayaran Niaga
Divisions: Program Studi > D3-Ketatalaksanaan Pelayaran Niaga
Depositing User: AMNI Perpustakaan Semarang
Date Deposited: 05 Sep 2022 08:52
Last Modified: 05 Sep 2022 08:52
URI: http://repository.unimar-amni.ac.id/id/eprint/4532

Actions (login required)

View Item View Item