PROSES KAPAL DALAM MELAKUKAN DOCKING DI PT. WIRA ARIANDI UTAMA

ANJASMORO, ANJASMORO (2021) PROSES KAPAL DALAM MELAKUKAN DOCKING DI PT. WIRA ARIANDI UTAMA. KARYA TULIS.

[img] Text
BAB 1 OKE.pdf

Download (174kB)
[img] Text
BAB 2 OKE.pdf

Download (247kB)

Abstract

In the process of repairing ships, there is the term docking. Docking is any type of repairs carried out above the dock. Considering the ship is a product that is very technology intensive, it requires very thorough preparation before docking. This aims to reduce costs and speed up the docking time so that the ship can be reused according to its function. There are 4 types of docking, 1. docking pool (graving dock), 2. floating docking (floating dock), 3. pullpull (slipway dock), 4. docking lift (syncrholift). Of the four types of suctioning, PT. Wira Ariandi Utama prefers the docking pool (graving dock) because it is more efficient and easier to carry out docking and the cost of docking is less, to maximize dosing there are steps that must be carried out before and after docking, namely docking list preparation, preparation making SOW (SCOPE OF WORK), recommendations from the classification body, documentation, determination of shipyards, notification to the classification and ship agency, notification by the skipper, preparation for repair and docking at the shipyard, supervision of functional tests and testing of owner surveyors, controlling, and final testing . If the final test is done, the ship is ready to sail. Keywords: Repairing Ships, Preparation, Supervision.

Item Type: Article
Additional Information: 185620019
Subjects: Teknika
Divisions: Program Studi > D3-Teknika
Depositing User: AMNI Perpustakaan Semarang
Date Deposited: 10 Jun 2021 01:59
Last Modified: 10 Jun 2021 01:59
URI: http://repository.unimar-amni.ac.id/id/eprint/3463

Actions (login required)

View Item View Item