ARGO, SYAHRUL MUJAHIDIN (2021) KERUSAKAN PADA POMPA HIDROLIK CRANE SAAT TERJADI BONGKAR MUAT DI MV. MAJESTY. KARYA TULIS.
Text
2. BAB 1-dikonversi (1).pdf Download (144kB) |
|
Text
3. BAB 2-dikonversi.pdf Download (583kB) |
Abstract
The electric motor is inseparable from the presence of loading and unloading tools on the ship, namely cargo cranes which are used for the process of loading onto the ship or the process of loading and unloading from ship to land so that the ship can perform its function properly. The existence of problems or damage to the electric motor component system and hydraulic system on the crane, can result in delays in the grab / grab and decreased performance of the crane so that the loading and unloading process cannot work normally. Immediately there is a check on the crane. Given the importance of cargo cranes in order to be able to lift loads according to their safe working load, the presence of cargo cranes on board must be well cared for, knowing the factors that cause cargo cranes to not lift loads and efforts to overcome these problems it is hoped that handling of cargo cranes is more directed and down time cargo cranes are smaller and do not interfere with the loading and unloading process and the operation of the ship itself so that shipping activities can run smoothly and the company does not experience losses. For problems that occur and provide suggestions to carry out improvements according to the Intruction Manual Book. Keywords: Electric Motor, Cargo Crane Engine Hydraulic System, Related Components, Damage, Repair.
Item Type: | Article |
---|---|
Additional Information: | 185620023 |
Subjects: | Teknika |
Divisions: | Program Studi > D3-Teknika |
Depositing User: | AMNI Perpustakaan Semarang |
Date Deposited: | 26 Mar 2021 04:34 |
Last Modified: | 26 Mar 2021 04:34 |
URI: | http://repository.unimar-amni.ac.id/id/eprint/3238 |
Actions (login required)
View Item |