ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI BERTHING TIME DI PELABUHAN CPO KABIL BATAM (Studi Kasus di Pelabuhan CPO Kabil Batam)

YESQIE, NURTALITA GINTHA (2020) ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI BERTHING TIME DI PELABUHAN CPO KABIL BATAM (Studi Kasus di Pelabuhan CPO Kabil Batam). SKRIPSI.

[img] Text
BAB I.pdf

Download (400kB)
[img] Text
BAB II.pdf

Download (378kB)

Abstract

Indonesia is the largest maritime country in the world, 2/3 of Indonesia's territory is a sea area. The port is the main facility in activities related to sea transportation. One of the activities in the port is loading and unloading. This study aims to determine the effect of Man Power, Loading and Unloading Productivity, and Machiness partially and simultaneously on Berthing Time at CPO Kabil Batam Port. The population in this study was taken from the Crew ABK PT. Pertamina Trans Kontinental Batam Branch and the sample used in this study were 100 respondents. The sampling technique used was a census sampling technique. The analytical method used in this research is descriptive analysis and quantitative analysis, then the data is analyzed using multiple linear regression with the help of (software) Statistic Package for Social Science (SPSS). Hypothesis test results show that the variables Man Power, Loading and Unloading Productivity, and Machiness partially and simultaneously affect the Berthing Time at CPO Kabil Batam Port. The results of multiple linear regression analysis obtained Y = 3.015 - 0.394X1 - 0.316X2 - 0.356X3 + µ. From this equation, it is known that the variable that has the most dominant influence on Berthing Time is the Man Power variable with a regression coefficient of -0.394. The R2 (R square) test results in 0.574 or 57.4%, which means that the Berthing Time at CPO Kabil Batam Port is influenced by the variables of Man Power, Loading and Unloading Productivity, which is 57.4% and other factors that affect Berthing Time. at Batam's Kabil CPO Port, amounting to 42.6%. Keywords: Man Power, Loading and Unloading Productivity, Machiness and Berthing Time.

Item Type: Article
Additional Information: 1617.04.160
Subjects: Transportasi
Divisions: Program Studi > S1-Transportasi
Depositing User: AMNI Perpustakaan Semarang
Date Deposited: 04 Mar 2021 04:03
Last Modified: 04 Mar 2021 04:03
URI: http://repository.unimar-amni.ac.id/id/eprint/3233

Actions (login required)

View Item View Item