MAULANA, FAJAR MULTAZAM (2023) PEMBONGKARAN MUATAN CURAH DI PELABUHAN PELINDO III TANJUNG EMAS SEMARANG. KARYA TULIS.
Text
1. Sampul.pdf Restricted to Repository staff only Download (284kB) |
|
Text
BAB 1.pdf Restricted to Repository staff only Download (146kB) |
|
Text
BAB 2.pdf Restricted to Repository staff only Download (126kB) |
|
Text
bab 3.pdf Restricted to Repository staff only Download (81kB) |
|
Text
BAB 4.pdf Restricted to Repository staff only Download (266kB) |
|
Text
BAB 5.pdf Restricted to Repository staff only Download (95kB) |
Abstract
The process of unloading is the activity of unloading the cargo from the hold of the ship onto the dock or directly onto the transportation means or onto the barge. The loading and unloading procedure is a step or requirement that must be carried out when carrying out the loading and unloading process. Based on the background that has been presented, problems can be formulated, among others, how are the unloading procedures at the Pelindo III Tanjung Emas port in Semarang, as well as what are the obstacles that occur during the process of unloading bulk cargo and how to increase worker productivity during the unloading process. bulk load. In this writing the writer uses descriptive qualitative method, while the data collection method used is the method of interviewing, observation and literature related to loading and unloading. Based on the background of the problems that have been raised, problems were found in the process of unloading bulk cargo, such as weather factors, lack of supervision during the unloading process, and damage or malfunction of the tool due to the tool that is not suitable for use or does not meet the requirements or is damaged due to the process. unloading. And efforts to increase work productivity carried out by PT. Pelindo III Tanjung Emas Semarang is by providing a good work environment, conducting training or training for workers, familiarizing the tools to be used, compiling a work plan and estimating time or compiling a good time line. So it can be concluded that there are several factors that can affect the demolition process, including weather factors, equipment damage and human errors. Keywords: Discharging, cargo, constraints
Item Type: | Article |
---|---|
Additional Information: | 185630086 |
Subjects: | Nautika |
Divisions: | Program Studi > D3-Nautika |
Depositing User: | AMNI Perpustakaan Semarang |
Date Deposited: | 28 Nov 2023 01:30 |
Last Modified: | 28 Nov 2023 01:30 |
URI: | http://repository.unimar-amni.ac.id/id/eprint/5743 |
Actions (login required)
View Item |