YASER, AL GHOZALI (2019) PROSES KEGIATAN PEMBONGKARAN HELICOPTER EX. MV. ARIFE OLEH PT. TIRANG JAYA SAMUDERA DI PELABUHAN TANJUNG EMAS SEMARANG. KARYA TULIS.
Text
BAB I.pdf Download (389kB) |
|
Text
BAB 2.pdf Download (294kB) |
Abstract
The main discussion in this paper is to explain the process of loading helicopters by PT. Tirang Jaya Samudera. From the start of the process the documents needed in the process of demolition until the goods are sent to the destination. During the demolition process Helicopter requires tools such as ship cranes, shackle, hooks, wire slings, chain slings, belt slings. Documents are very important in the process of unloading such as a letter of appointment to the issuance of a bill to the owner of the goods. At the time of demolition, it will involve several companies or agencies in carrying out demolition, such as EMKL as trucking. Keywords: Unloading, Process, Helicopter, Documents, Tools
Item Type: | Article |
---|---|
Additional Information: | 165410236 |
Subjects: | Ketatalaksanaan Pelayaran Niaga |
Divisions: | Program Studi > D3-Ketatalaksanaan Pelayaran Niaga |
Depositing User: | AMNI Perpustakaan Semarang |
Date Deposited: | 22 Jan 2020 03:43 |
Last Modified: | 22 Jan 2020 03:43 |
URI: | http://repository.stimart-amni.ac.id/id/eprint/746 |
Actions (login required)
View Item |