ANALISIS KESIAPAN SARANA PRASARANA, KETERSEDIAAN BATUBARA, DAN KINERJA PEGAWAI TERHADAP PRODUKTIVITAS BONGKAR MUAT BATUBARA PADA PT. PELABUHAN INDONESIA III (PERSERO) CABANG TANJUNG INTAN CILACAP

FRILIA, ESTI ANGGRAENI (2019) ANALISIS KESIAPAN SARANA PRASARANA, KETERSEDIAAN BATUBARA, DAN KINERJA PEGAWAI TERHADAP PRODUKTIVITAS BONGKAR MUAT BATUBARA PADA PT. PELABUHAN INDONESIA III (PERSERO) CABANG TANJUNG INTAN CILACAP. SKRIPSI.

[img] Text
BAB II yang baru JADI.pdf

Download (454kB)
[img] Text
BAB I yang baru JADI.pdf

Download (496kB)

Abstract

The purpose and the hypothesis of this research is aim to analyze the effect of variable the readiness of infrastructure (X1), availability of coal (X2), and performance of employees (X3), to the variable stevedoring productivity (Y). This object of this research is taken by crew of coal’s ship, stevedoring worker, and employees of the PT. Pelabuhan Indonesia III (Persero) Branch of Tanjung Intan Cilacap with total 76 respondents. The data analysis is using Regression model tools SPSS Version 22,0. The result from this analysis is the readiness of infrastructure, availability of coal, and performance of employees, have positive and significant impact to the variable stevedoring productivity. The output from variable the readiness of infrastructure, availability of coal, and performance of employees, have impact on the variable stevedoring productivity with amount 69,4%, while the rest 30,6% influenced other variables outside the study. Keywords : Readiness of Infrastructure, Availability of Coal, Performance of Employees, Stevedoring Productivity.

Item Type: Article
Additional Information: 1703.14.003
Subjects: Transportasi
Divisions: Program Studi > S1-Transportasi
Depositing User: AMNI Perpustakaan Semarang
Date Deposited: 20 Jan 2020 02:17
Last Modified: 20 Jan 2020 02:17
URI: http://repository.stimart-amni.ac.id/id/eprint/620

Actions (login required)

View Item View Item