SISTEM DAN PROSEDUR PELAYANAN PEMBERITAHUAN KEDATANGAN KAPAL DI KANTOR OTORITAS PELABUHAN UTAMA TANJUNG PERAK SURABAYA

JIMMY, FATHAN (2023) SISTEM DAN PROSEDUR PELAYANAN PEMBERITAHUAN KEDATANGAN KAPAL DI KANTOR OTORITAS PELABUHAN UTAMA TANJUNG PERAK SURABAYA. KARYA TULIS.

[img] Text
COVER KTI JIMMY1.docx
Restricted to Repository staff only

Download (33kB)
[img] Text
ABSTRAK_KTI_JIMMY1[1].docx
Restricted to Repository staff only

Download (21kB)
[img] Text
KTI_BAB_1_JIMMY_REVISI1.docx
Restricted to Repository staff only

Download (35kB)
[img] Text
KTI_BAB_2_JIMMY_REVISI(NEW).docx
Restricted to Repository staff only

Download (31kB)
[img] Text
KTI_BAB_3_JIMMY_REVISI1.docx
Restricted to Repository staff only

Download (32kB)
[img] Text
KTI_JIMMY_BAB_4_REVISI(NEW)1.docx
Restricted to Repository staff only

Download (433kB)
[img] Text
KTI_JIMMY_BAB_5_REVISInew.docx
Restricted to Repository staff only

Download (21kB)

Abstract

Indonesia is known as a maritime country because most of its territory is water and is in the form of an archipelago. Therefore, sea transportation is one of the important links between islands. There are many choices of sea transportation that can be used, one of which is ships. So in this case, the role of the authority office in providing PKK is needed to avoid irregular ship arrival schedules. PKK (Ship Arrival Notification) itself is a report on the planned arrival of ships submitted by national sea transportation companies, organizers of special sea transportation activities and people's sea transportation companies to Port Operators. Such as the role of the Tanjung Perak Surabaya Main Port Authority Office in providing notification of ship arrival services, which often experience problems such as changing ship arrival schedules due to erratic weather conditions, resulting in schedule delays that are not in accordance with previous provisions. Therefore, the company or porter on duty must be able to maximize time and always coordinate with the harbormaster and shipping lane monitoring center in order to minimize delays in the ship's arrival schedule. Keywords: Port, PKK System, Constraints

Item Type: Article
Additional Information: 195710081
Subjects: Ketatalaksanaan Pelayaran Niaga
Divisions: Program Studi > D3-Ketatalaksanaan Pelayaran Niaga
Depositing User: AMNI Perpustakaan Semarang
Date Deposited: 24 Nov 2023 01:21
Last Modified: 24 Nov 2023 01:21
URI: http://repository.unimar-amni.ac.id/id/eprint/5736

Actions (login required)

View Item View Item