Manajemen Risiko Usaha Bangunan Baru di Industri Galangan Kapal

Sugeng, Haryadi and Lilik, Budiyanto (2023) Manajemen Risiko Usaha Bangunan Baru di Industri Galangan Kapal. JURNAL.

[img] Text
6.jurnal manajemen resiko.pdf

Download (948kB)

Abstract

Abstract. Operational management is very important and should not be ignored in a shipbuilding industry. Development and modeling in risk management should be applied to make the construction of vessel is more efficient in terms of time and costs. the first step in the risk management is concepting IIAR: (1) Identification, is identifying of the location, time, cause, and the process of the happen of risk that may block, degrade, delay, or increase the aim of work in the shipyards; (2) Inventory of the data, perform of collecting data that supports the identification of all the risks that exist, starting at the submission of the draft document from the owner until the ship erection; (3) Analyze (assessment) is analyzing by schedule risk using a mathematical model approach, the analysis conducted by the reduction of schedule risk on project management, using the databases, using cost risk and schedule risk in the risk analysis; and (4) Result, is the results obtained after conducting a risk assessment, risk ratio, identification of risk rating, and control risks including risk mitigation. Keywords : risk management, shipyard

Item Type: Article
Subjects: Artikel Ilmiah Dosen
Divisions: Program Studi > D3-Teknika
Depositing User: AMNI Perpustakaan Semarang
Date Deposited: 16 May 2023 04:30
Last Modified: 16 May 2023 04:30
URI: http://repository.unimar-amni.ac.id/id/eprint/5266

Actions (login required)

View Item View Item