ARIS, KRISTIANA (2022) PEMBONGKARAN CLINKER IN BULK MV MANALAGI ENZI OLEH PERUSAHAAN BONGKAR MUAT PT. CIOMAS ARIYA BERKAH DI PELABUHAN CIWANDAN. KARYA TULIS.
Text
ARIS KRISTIANA.pdf Restricted to Repository staff only Download (1MB) |
Abstract
The main discussion in the writing of this Paper is about dismantling Clinker in bulk by a loading and unloading company PT. Ciomas Ariya Berkah in Banten Ciwandan Port. Background problems in this paper, namely how discharging the Clinker in bbulk, the tools used, the parties involved, and documents for the completion of the discharge. The company is engaged in loading and unloading which includes stevedoring, cargodoring, receiving and delivery activities. The purpose of writing this paper is to find out how the Clinker in bulk stevedoring activities from the ship to the dock, what tools are used, who are the parties involved and what documents are made in the discharge. Based on data collection conducted during land practice the author uses several data collection methods including methods of observation, interviews and literature. The results show that the Clinker in bulk discharge will run smoothly and in accordance with predetermined estimates if there is no waiting truck, weather factors and all crew and other relevant parties can be responsible for their respective duties. Keywords : Clinker in bulk, Stevedoring, Cargodoring, Receiving
Item Type: | Article |
---|---|
Additional Information: | 195710025 |
Subjects: | Ketatalaksanaan Pelayaran Niaga |
Divisions: | Program Studi > D3-Ketatalaksanaan Pelayaran Niaga |
Depositing User: | AMNI Perpustakaan Semarang |
Date Deposited: | 05 Jan 2023 02:13 |
Last Modified: | 05 Jan 2023 02:13 |
URI: | http://repository.unimar-amni.ac.id/id/eprint/4594 |
Actions (login required)
View Item |