PELAYANAN JASA BONGKAR BATU BARA PADA KAPAL TB. MEGA TOP 21 / BG. STAR ALLIANCE 02 OLEH PERUSAHAAN BONGKAR MUAT PT. DELTHA ARTHA BAHARI NUSANTARA DI PELABUHAN TERMINAL BARU PROBOLINGGO

FERDY, MAULANA PRASETYO (2022) PELAYANAN JASA BONGKAR BATU BARA PADA KAPAL TB. MEGA TOP 21 / BG. STAR ALLIANCE 02 OLEH PERUSAHAAN BONGKAR MUAT PT. DELTHA ARTHA BAHARI NUSANTARA DI PELABUHAN TERMINAL BARU PROBOLINGGO. KARYA TULIS.

[img] Text
FERDY MAULANA PRASETYO.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

To achieve the optimal execution of coal loading using excavator. So in writing this scientific work, the author describes the implementation of the preparation of unloading coal. Based on the background of the problems that have been stated, obstacles were found in the prearation and implementation of loading and unloading at BG Star Alliance 02. Namely the erratic weather and the small number of transportation fleets. So it can be concluded that before carrying out the unloading and lack of supervision at the time of loading resulted in the implementatio of coal unloading being not optimal. The author’s suggestion is that the company can anticipate the weater, and increase the number of transportation fleets and pay more attention to the demand for ships, so that the loading and unloading proces is carried out as optimally as possible. To support the completion of this paper, the method used for the author is a qualitative descriptive method, while the collection methods used are interviews, observations,and literature related to cargo handling,especially during loading and unloading. Keyword : Loading and Unloading,Optimal,Preparation.

Item Type: Article
Additional Information: 195710067
Subjects: Ketatalaksanaan Pelayaran Niaga
Divisions: Program Studi > D3-Ketatalaksanaan Pelayaran Niaga
Depositing User: AMNI Perpustakaan Semarang
Date Deposited: 21 Jul 2022 03:53
Last Modified: 21 Jul 2022 03:53
URI: http://repository.unimar-amni.ac.id/id/eprint/4305

Actions (login required)

View Item View Item