ABDUL, RASYID (2020) PROSES BONGKAR MUAT KONTAINER MV. MARIA PIA OLEH PT. PERUSAHAAN PELAYARAN NUSANTARA PANURJWAN DI PELABUHAN TANJUNG EMAS SEMARANG. KARYA TULIS.
Text
BAB 1.pdf Download (309kB) |
|
Text
BAB 2.pdf Download (592kB) |
Abstract
Unloading and loading process activities are unloading and loading activities cargos from ships to docks / barges / trucks into ships until arranged in the hatch which requires various agencies and there are various documents related to the unloading and loading process and there are various obstacles that occur during the process of unloading and loading. The purpose of unloading and loading activities is very important namely to encourage the achievement of national logistics integration and evenly distributed well in the region urban and rural areas. In order to achieve logistical integration nationally it is expected that all logistics activities throughout Indonesia both between regions and between islands can operate effectively and efficiently and become one unit which are mutually integrated nationally within the territory of Indonesia. The method used to solve the problem by adjusting goodest unloading and loading tools and the carrying capacity is greater than the total weight of the load will speed up the unloading and loading process. The results of solving the problem by working on modern equipment, So that made an impact of the unloading and loading process complete on time and minimize the risk of being small. Keywords :Process, Loading and Unloading, Effective, Safety First
Item Type: | Article |
---|---|
Additional Information: | 175530002 |
Subjects: | Nautika |
Divisions: | Program Studi > D3-Nautika |
Depositing User: | AMNI Perpustakaan Semarang |
Date Deposited: | 03 Jul 2020 04:03 |
Last Modified: | 03 Jul 2020 04:03 |
URI: | http://repository.unimar-amni.ac.id/id/eprint/2886 |
Actions (login required)
View Item |