FATAH, ARIYANTO SUBROTO (2019) PROSEDUR PENGERJAAN GRAVING DOCK KAPAL KING ARTHUR 8 DI JANATA MARINA INDAH (JMI) SEMARANG. KARYA TULIS.
Text
BAB 1 PEND REVISI.pdf Download (386kB) |
|
Text
BAB 2 TINJ REVISI.pdf Download (406kB) |
Abstract
Work procedur of King Arthur 8 Ship At Janata Marina Indah (JMI) Semarang Graving dock work procedures are carried out because of a shipping company or shipping fleet, specifically to meet the needs of ship maintenance services in docking, repairing, and new shipbuilding. As a private national shipyard company in Indonesia that plays a role in the shipping industry in the national, regional and global markets. PT. Janata Marina Indah Semarang has the responsibility to know what things have to be prepared by the agent of King Arthur 8 and PT. Janata Marina Indah and to know the stages of graving dock translation of King Arthur's ship 8. Service work that can be performed by PT. Janata Marina Indah is docking and maintenance of ships, replating, overhauling, electricity, radio, tank cleaning, and other related services. by marine. In this case the data collection method used by means of observation that occurs in the field directly plunged in the field, then all information is collected through observation. Preparing docking list, preparation of SOW recommendations from the classification body, documentation, determination of shipyards, notification by the captain. Then preparations to enter the dock, make the ship so that it does not even keel, maintain stability of the ship, preparation in the dock by the shipyard, remove the ship from the dock. Keyword : procedure, work, graving dock
Item Type: | Article |
---|---|
Additional Information: | 165430067 |
Subjects: | Nautika |
Divisions: | Program Studi > D3-Nautika |
Depositing User: | AMNI Perpustakaan Semarang |
Date Deposited: | 30 Jun 2020 05:24 |
Last Modified: | 30 Jun 2020 05:24 |
URI: | http://repository.unimar-amni.ac.id/id/eprint/2669 |
Actions (login required)
View Item |