ANDRI, MASWAHYUNDRI (2019) PENGOPERASIAN DAN PERAWATAN KOMPRESOR UDARA DI KM.IDAH VIRGO PT. BINTAN MEGAH ABADI. KARYA TULIS.
Text
BAB I.pdf Download (10kB) |
|
Text
BAB II.pdf Download (607kB) |
|
Text
BAB II.pdf Download (607kB) |
Abstract
To support production process keep going from engine stuck, we have to devise a maintenance action or replacement of a damaged engine compressore. If the maintenance alternatively exist longer, it will increase prevented-maintenance cost. So need to find an interval of maintenance and repair to minimize total cost of maintenance and repair by using reliability analyse. In determining interval time of optimum maintenance and repair to critical spare part, reliability analyse is applied against those components by using available downtime data as a premise to find the time of optimum maintenance and repair. The calculation result of reliability valve against the critical components, are expected as input to devise strategy of maintenance and repair optimizely. Optimum determining interval time of maintenance and repair optimizely in this research recomonded each component`s reliability index with the interval time of maintenance and repair component Exhaust valve compressore and Intake valve compressore are on the day 450th, Expansion valve component is on the day 630th and Ring set compressore component is on the day 1170th with time interval one year are optimum policy. Keywords : Reliability value, Maintenance, Repair.
Item Type: | Article |
---|---|
Additional Information: | 125020028 |
Subjects: | Teknika |
Divisions: | Program Studi > D3-Teknika |
Depositing User: | AMNI Perpustakaan Semarang |
Date Deposited: | 24 Feb 2020 07:16 |
Last Modified: | 24 Feb 2020 07:16 |
URI: | http://repository.stimart-amni.ac.id/id/eprint/1543 |
Actions (login required)
View Item |