DENY, APIT SANJAYA (2019) PROSES KEGIATAN PEMBONGKARAN SOYBEAN EX MV. PAC DUBHE OLEH PT. GARUDA LAUT PERKASA DI PELABUHAN TANJUNG EMAS SEMARANG. KARYA TULIS.
Text
BAB I.pdf Download (302kB) |
|
Text
BAB II.pdf Download (395kB) |
Abstract
Company unloading (PBM) is a legal entity specifically established to organize and commercialize the loading and unloading of goods from or to the ship, the Company loading and unloading can conduct business activities of loading and unloading of goods to and from ships both for the national ships or boats Foreigners in Ageni by sea transport companies. Services company loading and unloading is an Indonesian legal entity specially set up to organize and commercialize the loading and unloading of goods from / to the ship, Loading and unloading are the activities move goods from the ship or to the boat for transport to the yard in the barn Terminal is spot on proceed at least with facilities such as moorings, docks, container yard, supporting facilities and equipment adequate to serve the loading muat.Terminal opration As where follow-up to Presidential Instruction No. 4 Year 1985KepMen Hub 14 Year 2002, and the last PM. 60 Thn.2014 About: Implementation and utilization of loading and unloading goods from and to the ship, then the terminal operation activities include: Stevedoring, CARGODORING, RECEIVING / DELIVERY. Goods which charge is transported from or to the ship for export or import, in the loading and unloading activities are required to stevedoring company (PBM) for the provision of supervision and unloading equipment according to the needs and conditions apply. Meanwhile, service providers stevedoring company conducting loading and unloading (stevedoring, cargodoring, and receiving / delivery) by using labor (TKBM) and equipment loading and unloading, stevedoring is the work unload goods from ships to dock / barge / truck or loading goods from dock / barge / truck into the vessel until the vessel arranged in the hold using a crane or crane ship ashore. Cargodoring is untied boat at the dock and transported from the dock to the
Item Type: | Article |
---|---|
Additional Information: | 135110069 |
Subjects: | Ketatalaksanaan Pelayaran Niaga |
Divisions: | Program Studi > D3-Ketatalaksanaan Pelayaran Niaga |
Depositing User: | AMNI Perpustakaan Semarang |
Date Deposited: | 10 Feb 2020 08:04 |
Last Modified: | 10 Feb 2020 08:04 |
URI: | http://repository.stimart-amni.ac.id/id/eprint/1453 |
Actions (login required)
View Item |