PROSES PEMBONGKARAN BATU BARA TB SRIKANDI BARUNA 2401/BG BARUNA POWER 3302 VOY 03/2016 OLEH PT. ADHIGUNA PUTERA DI PELABUHAN REMBANG

DEWI, SUSANTI (2019) PROSES PEMBONGKARAN BATU BARA TB SRIKANDI BARUNA 2401/BG BARUNA POWER 3302 VOY 03/2016 OLEH PT. ADHIGUNA PUTERA DI PELABUHAN REMBANG. KARYA TULIS.

[img] Text
BAB I kti dewi baru.pdf

Download (122kB)
[img] Text
BAB II kti dewi s.pdf

Download (326kB)

Abstract

PT. Adhiguna Putera basically functions as the party that provides the service in terms of infrastructure for cargo handling in both the loading and offloading. The researchers' goal of this paper to find out the process of unloading the coal TB.SRIKANDI BARUNA 2401 / BG BARUNA POWER 3302 VOY 03/2016 in Rembang port. In the study the authors used a qualitative research because the data obtained will be elaborated information data sources. From the research process of unloading coal TB. SRIKANDI BARUNA 2401 / BG BARUNA POWER 3302 VOY 03/2016 in Rembang port frequent obstacles that, at the time of the activities carried out in the port weather conditions erratic. During the rainy season the loading should be postponed until the rain stopped for fear of damage to the cargo. Keywords: Stevedoring, Activities, Unloading Equipment, Documents.

Item Type: Article
Additional Information: 135110071
Subjects: Ketatalaksanaan Pelayaran Niaga
Divisions: Program Studi > D3-Ketatalaksanaan Pelayaran Niaga
Depositing User: AMNI Perpustakaan Semarang
Date Deposited: 10 Feb 2020 08:01
Last Modified: 10 Feb 2020 08:01
URI: http://repository.stimart-amni.ac.id/id/eprint/1415

Actions (login required)

View Item View Item