PROSES PEMBONGKARAN KAYU LOG TB. BRAWIJAYA VIII / TK. SOLUNA 16 OLEH PBM PT. PUALAM EMAS PERKASA DI PELABUHAN TANJUNG EMAS SEMARANG

JUHARIYADI, NOR (2019) PROSES PEMBONGKARAN KAYU LOG TB. BRAWIJAYA VIII / TK. SOLUNA 16 OLEH PBM PT. PUALAM EMAS PERKASA DI PELABUHAN TANJUNG EMAS SEMARANG. KARYA TULIS.

[img] Text
BAB 2.pdf

Download (451kB)
[img] Text
BAB I johari sudah revisi.pdf

Download (448kB)

Abstract

In the main discussion in the writing of this paper is about the process of dismantling Log Wood by the loading and unloading company PBM PT. Golden Mighty Rage. There are several background issues that must be solved by the author that is about the system and procedures after getting a working order SPK, the necessary docs for OP operational applications OP, understanding and function of the company loading, log loading process unloading, general cargo loading equipment. PT. Pualam Emas Perkasa is a loading and unloading company that serves the demolition and loading of dry bulk such as coal, quartz sand, palm oil waste and log wood. The purpose of writing this paper is none other than to know the system and procedure after getting the letter of working order, the necessary documents for OP oprasional operational request, to know the meaning and function of the loading and unloading company, log loading and unloading process general cargo . Based on data collection conducted during practice land (Prada), the author uses several methods of interviews, observation, document studies, and focus group discussions as well as the source and type of data. The result of the discussion of this paper is the process of log demolition log by the loading and unloading company PBM PT. The Golden Might's rage to be able to unload wooden logs from ships there are stages to be done. The constraints that most often occur when unloading such as damage factor unloading tool. So in the process of log demolition logs need to note check the tools and facilities unloaded carefully so that when the process of dismantling does not happen obstacles that inhibit. Keywords: Dismantling, Logs, Processes, Facilities

Item Type: Article
Additional Information: 155310089
Subjects: Ketatalaksanaan Pelayaran Niaga
Divisions: Program Studi > D3-Ketatalaksanaan Pelayaran Niaga
Depositing User: AMNI Perpustakaan Semarang
Date Deposited: 29 Jan 2020 03:13
Last Modified: 29 Jan 2020 03:13
URI: http://repository.stimart-amni.ac.id/id/eprint/1022

Actions (login required)

View Item View Item